The ‘Work Breakdown Structure’ of our home

To calculate the estimated cost of building our sustainable small home, I first had to figure out all the elements required in its construction. A ‘Work Breakdown Structure’ is the term we applied to this process when I was designing structures for airplanes – I’m not sure if it’s the term architects use.  Searching for information that would allow me to do a ‘Work Breakdown Structure’ I found the QV cost builder website and a document named “Elemental Analysis of Costs of Building Projects”. I also spent a lot of time googling examples to create the following list of cost elements for our home. Hopefully this covers everything.

Overhead
  • Consulting
    • Engineering reports/structural design site/foundation
    • Geotechnical report
    • Surveyor
    • Drainage, hydraulic engineering report
    • Quantity surveyor
    • Architect
    • Resource consent application
    • Landscape design
  • Resource consent
  • Building consent
  • Builders construction and liability Insurance
  • Performance and blower test (possibly)
  • LIM report and certificate of title
Siteworks
  • Excavation and foundation
    • Excavation
    • Retaining walls
    • Piles foundation
    • Groundworks
  • Landscaping and Lawns
    • Driveway
    • Parking
    • Paths
    • Stairs
    • Decks
    • Railings
    • Plants
    • Trees
  • Septic system
  • Water tanks
House    
  • Structure/framing
    • Sub Floor
    • Wall structure external and internal
    • Roof
    • Insulation
    • Rainwater system
    • Exterior cladding
    • Interior lining
    • Flooring
    • Doors exterior
    • Doors interior
    • Plastering
    • Painting
    • Door hardware and keys
    • Increased wall to floor ratios
  • Windows
  • Electrical
    • Double power points throughout
    • Data connections
    • Safety plugs several locations
    • Lights, incl exterior
    • Mains power
    • Solar panels inst.
    • EV car connection
    • Domotica
  • Plumbing
    • Main connection water tank
    • Kitchen
    • 1 x Toilet
    • 1 x Shower
    • 1 x Vanity
    • (1 x Bath)
    • 1x outside shower
    • Water heater
    • 1 x 300 litre HWC?
  • Wood burner
  • Solar panels
  • Solar water heater/hot water cylinder
  • Kitchen
    • Tabletop
    • Cupboards, cabinets
    • Tiles
    • Sink
    • Tapware
  • Kitchen appliances
    • Dishwasher
    • Microwave
    • Oven
    • Refrigerator
    • Cooktop
  • Laundry
    • Washingmachine/dryer
  • Bathroom
    • Shower
    • Bath
    • Vanities
    • Tiles wall and floor
    • Mirrors
    • Tapware bath, shower, basins
  • Toilet
    • Toilet
    • Tiles wall floor
Add to total building cost
  • Builders profit
  • Tax
  • Unforeseen