Lift-off! Site works and retaining walls under way

Lift-off! The building works have started with the digger on site for the ground works removing the topsoil, making the cut in the hill to create some flat areas and drilling and installing the first poles of the retaining walls.

20181105_091136 copy

Making the cut into the hill and removing the top soil

20181109_122158 copy

Retaining wall

20181109_121636 copy

First contour of the drive way

20181109_122230 copy

Drilling the holes for the other retaining wall of the parking bay

 